[Dry Mist Installation Case] Taiyo Nursery School (Chiba Prefecture)
Introducing a case study of the implementation of dry mist in a nursery.
We would like to introduce a case study of the introduction of dry mist at Taiyo Nursery (Chiba Prefecture). There have been many requests from parents to limit the use of air conditioning. Dry mist does not cause sudden temperature changes like air conditioning, making it safe for children to use. 【Case Overview】 ■ Area Covered: Approximately 80m2 ■ Total Number of Nozzles: 18 ■ Water Usage: 0.9L/min ■ Power Consumption: 0.75kW *For more details, please refer to the PDF document or feel free to contact us.
- Company:なごミスト設計
- Price:Other